Nestum Maintenance
The maintenance has concluded. Access to the machine is restored.
Due to a reconfiguration of the system’s networking, the machine will be unavailable tomorrow, 24.08.2017 from 14:00 GMT+2 to 16:00 GMT+2. As of this evening (23.08) all nodes are set to a DRAIN state, meaning that existing jobs will run, but no new jobs can be started. Unfortunately, if the job does not terminate until
Research held at the HPC lab in the Sofia Tech Park has demonstrated that vacancies in bilayer graphene can be used for controllable magnetization of the material. The results will be presented at the European Advanced Materials Congress (EAMC), which is a principal annual international conference in the field organised by International Association of Advanced
Here is a pdf version of the material presented in the WRF seminar on 01.08.2017 (in Bulgarian).