Planned power grid outage
Due to additional construction and hardware installation, the Laboratory complex at Sofia Tech Park will experience a power outage tomorrow (06.04.2019), between 8:30 and 17:30 EEST. Subsequently, Nestum will be unavailable for the duration of the power outage. The long.p partion in the workload manager has been set to DRAIN, so no new jobs can […]