Planned power grid outage

Due to additional construction and hardware installation, the Laboratory complex at Sofia Tech Park will experience a power outage tomorrow (06.04.2019), between 8:30 and 17:30 EEST.

Subsequently, Nestum will be unavailable for the duration of the power outage. The long.p partion in the workload manager has been set to DRAIN, so no new jobs can be submitted on it.

We apologise for the inconvenience.

Scroll to Top